No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH628 V5 Server Node V100R005 Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the Front Drive Cage

Installing the Front Drive Cage

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH628 V5.

  3. Place the server node on the ESD workstation.
  4. Remove the drive drawer.

    For details, see Removing the Drive Drawer.

  5. Take the spare part out of its ESD bag.
  6. Determine the position of the front drive cage.
  7. Install the front drive cage.

    1. Place the front drive cage vertically on the mainboard. See (1) in Figure 4-48.
    2. Tighten the screws marked silkscreen "C" on the front drive cage. See (2) in Figure 4-48.
      Figure 4-48 Installing the front drive cage

  8. Install the drive drawer.

    For details, see Installing the Drive Drawer.

  9. Install the server node.

    For details, see Installing an XH628 V5.

  10. Power on the server node.

    For details, see Power-On Procedure.

Translation
Download
Updated: 2019-08-12

Document ID: EDOC1100036739

Views: 13298

Downloads: 20

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next