FusionServer Pro XH628 V5 Server Node V100R005 Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing the Cable Carrier

Removing the Cable Carrier

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH628 V5.

  3. Place the server node on the ESD workstation.
  4. Determine the position of the cable carrier.
  5. Disconnect the cable carrier from the drive drawer.

    1. Remove the data, power, and signal cables from the backplane for the 10-drive drawer.

      For details, see Internal Cabling.

    2. Pull apart the tab on the cable carrier connector in the arrow direction. See (1) in Figure 3-11.
    3. Keeping the tab open, remove the cable carrier connector. See (2) in Figure 3-11.
      Figure 3-11 Removing the cable carrier connector

  6. Remove the drive drawer.

    For details, see Removing the Drive Drawer.

  7. Disconnect the cable carrier from the compute module.

    1. Remove the data, power, and signal cables from the mainboard to the backplane for the 10-drive drawer.

      For details, see Internal Cabling.

      NOTE:

      The data cable, power cable, and signal cable from the mainboard to the 10-drive backplane for the drive drawer are secured in the cable carrier. Before removing the cable carrier from the compute module, remove the cables from the mainboard.

    2. Loosen the screws on the cable carrier bracket. See (2) in Figure 3-12.
    3. Pull out the cable carrier and its bracket in the arrow direction. See (2) in Figure 3-12.
      Figure 3-12 Removing the cable carrier

  8. Place the removed component in an ESD bag.
Translation
Download
Updated: 2019-08-12

Document ID: EDOC1100036739

Views: 13711

Downloads: 20

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next