No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH628 V5 Server Node V100R005 Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing an M.2 SSD

Installing an M.2 SSD

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH628 V5.

  3. Place the server node on the ESD workstation.
  4. Remove the drive drawer.

    For details, see Removing the Drive Drawer.

  5. Take the spare part out of its ESD bag.
  6. Determine the position of the M.2 SSD.

    Figure 4-8 Positions of M.2 SSDs

  7. Install the M.2 SSD.

    1. Tilt the M.2 SSD 20° to 30°, install it in the slot, and press it firmly. See (1) in Figure 4-9.
    2. Use an M2.5 Phillips screwdriver to tighten the screw to secure the M.2 SSD. See (2) in Figure 4-9.
    Figure 4-9 Installing an M.2 SSD

  8. Install the drive drawer.

    For details, see Installing the Drive Drawer.

  9. Install the server node.

    For details, see Installing an XH628 V5.

  10. Power on the server node.

    For details, see Power-On Procedure.

Translation
Download
Updated: 2019-08-12

Document ID: EDOC1100036739

Views: 16393

Downloads: 20

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next