No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH628 V5 Server Node V100R005 Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing an XH628 V5

Removing an XH628 V5

Procedure

  1. Determine the position of the server node in the chassis.

    Figure 3-1 Positions and slot numbers of the XH628 V5 server nodes

  2. Power off the server node.

    For details, see Power-Off Procedure.

  3. Remove the multi-port cable.

    1. Press the two tabs on the multi-port cable connector. See (1) in Figure 3-2.
    2. Remove the multi-port cable from the universal connector port (UCP) on the server. See (2) in Figure 3-2.
    Figure 3-2 Removing the multi-port cable

  4. Remove the optical cables and modules.

    • Replacing the optical cable, network cable, or optical module will interrupt services.
    • Wear ESD gloves or an ESD wrist strap when using die-casting pliers to replace optical or network cables or optical modules.
    • Do not exert too much force when using the die-casting pliers to prevent damage to the optical or network cables or optical modules.
    1. Use the die-casting pliers to clamp the optical cable connector and remove it from the port.
      Figure 3-3 Removing optical cables using die-casting pliers
    2. Use the die-casting pliers to clamp the optical module, unlock the security pin, and remove the optical module.
      Figure 3-4 Removing an optical module using die-casting pliers

  5. Remove the server node.

    • When removing a device, wear protective gloves to avoid burns.
    • To prevent device damage or personal injury, hold the bottom of the device with both hands when removing it.
    1. Press the ejector release button on the server node. See (1) in Figure 3-5.
    2. Fully open the ejector lever. See (2) in Figure 3-5.
    3. Holding the ejector lever, pull the server node out of the chassis horizontally. See (3) in Figure 3-5.
    4. Close the ejector lever.
    Figure 3-5 Removing the server node

  6. Place the removed server node in an ESD bag.

    Place only one server node in an ESD bag.

  7. Install filler panels.

    Install filler panels in vacant slots. Otherwise, the ventilation, heat dissipation, electromagnetic shielding, and dustproof effects of the chassis will be affected.

    1. Holding the filler panel by the side with a release button, insert the other side into the slot. See (1) in Figure 3-6.
    2. Push the other side into the slot until it clicks into place. See (2) in Figure 3-6.
    Figure 3-6 Installing a filler panel

Translation
Download
Updated: 2019-08-12

Document ID: EDOC1100036739

Views: 18584

Downloads: 20

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next