No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionServer Pro XH628 V5 Server Node V100R005 Maintenance and Service Guide 03

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing the Drive Drawer

Removing the Drive Drawer

Procedure

  1. Power off the server node.

    For details, see Power-Off Procedure.

  2. Remove the server node.

    For details, see Removing an XH628 V5.

  3. Place the server node on the ESD workstation.
  4. Determine the position of the drive drawer.

    Figure 3-15 Positions of the drive drawers

  5. Disconnect the cable carrier from the drive drawer.

    For details, see Removing the Cable Carrier.

  6. Remove the drive drawer.

    1. Loosen the screws marked silkscreen "A" on the server node case. See (1) in Figure 3-16.
    2. Horizontally pull the compute module away from the slot in the arrow direction, and lift it. See (2) in Figure 3-16.
      Figure 3-16 Removing the drive drawer

  7. Disconnect the cable carrier from the compute module.

    For details, see Removing the Cable Carrier.

  8. Place the removed component in an ESD bag.
Translation
Download
Updated: 2019-08-12

Document ID: EDOC1100036739

Views: 15423

Downloads: 20

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next