Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
High-Risk Operations on Server Management

High-Risk Operations on Server Management

The V300R010C00SPC500 version does not support server configuration deployment, firmware upgrade, and stateless computing. The V300R010C00SPC500 version having a patch later than V300R010C00SPC500 installed also does not support server configuration deployment, firmware upgrade, and stateless computing.

No.

Operation

Impact

Risk Level

Operation Requirements

1

Server configuration

Hard disk data will be cleared during RAID controller card configuration.

High

Pay attention to risk prompts displayed on eSight.

System data will be cleared during operating system deployment.

High

  • The operating system will be restarted during server HBA, CNA card, and BIOS configuration, causing service interruption.
  • The following impact occurs during server network, power-on or power-off, iBMC, and switch module configuration:
    • Power configuration affects service system performance.
    • Switch module configuration, such as E9000 switch module configuration, affects service networks.

Medium

2

Firmware upgrade

  • Upgrading the firmware RAID, CNA, NIC, HBA, IB, SSD, HDD, and NVDIMM, and driver RAID, CNA, HBA, NIC, and IB will exert the following impacts:
    • The operating system will be restarted during the upgrade of certain firmware, causing service interruption. The service interruption duration depends on the firmware type and quantity.
    • If flash memory refreshing fails after upgrades of certain PCIe cards, the PCIe cards need to be returned for repair.
  • When the firmware is upgraded for the server BIOS and CPLD, the operating system will be automatically or manually restarted, which may cause service interruption.
  • KunLun servers must be manually powered off before any firmware upgrade. Otherwise, the eSight will be powered off forcibly due to non-fully power-off.
  • When the CPLD of a switch module is upgraded, the Base, Fabric, and FC planes of the switch module will be restarted, which may cause service interruption.
  • When the driver is upgraded, the operating system will be automatically restarted, causing service interruption.
  • If the iBMA upgrade in the VMware operating system involves the iBMA driver upgrade, the operating system will be automatically restarted, causing service interruption.

Medium

  • Verify the reliability of firmware version sources.
  • Verify the necessity of firmware upgrades.
  • Pay attention to risk prompts displayed on eSight.

3

Stateless computing

Configuring the server UUID, RAID controller card, HBA, CNA, and BIOS in a profile will exert the following impacts:

  • Servers in domains cannot be powered on if eSight is powered off.
  • After a server is powered on, information in its profile will be automatically reconfigured, and the configuration takes about 20 minutes.
  • Deleting a server associated with a profile, deleting a server domain associated with a profile, and splitting a profile will cause server power-off.

Medium

  • Before loading a profile, familiarize yourself with the stateless computing feature and the controlled power-on mechanism.
  • Verify that the server configuration in a profile meets requirements before loading the profile.

Switch module configuration will exert the following impacts:

  • Operations involving switch module restart will cause service interruption.
  • Certain configuration operations may cause intermittent interruption of the VLAN service on switch modules.

Medium

Before configuring switch modules, familiarize yourself with the switch module configuration feature, ensure that the server hardware configuration meets requirements.

4

Server access

  • When eSight discovers switch modules, it automatically enables the SNMPv3 protocol on the switch modules. Switch modules can be directly accessed through the SNMPv3 protocol, which poses security risks.
  • Servers will be restarted during server power-on or power-off, causing service interruption.

Low

Pay attention to messages displayed on eSight.

Translation
Download
Updated: 2019-06-30

Document ID: EDOC1100044373

Views: 25110

Downloads: 74

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next