No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

eSight V300R010C00 Maintenance Guide 07

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Manually Performing the Switchover

Manually Performing the Switchover

After the specification of the standby server is adjusted, you need to adjust the specification of the active server. Therefore, the switchover must be performed to minimize the eSight service interruption time.

Context

Service data may be generated during the running of the active server. After the two-node cluster is normal, you need to reserve time for the standby server to synchronize data before performing the switchover.

Procedure

  1. Log in to the active eSight server as the ossuser user.
  2. Run the following commands to perform the switchover:

    > cd /opt/ommha/ha/bin

    > ./switchover.sh

  3. Verify the switchover. For details, see Verifying the Two-Node Cluster Status. If the active and standby servers are recovered after switchover, the switchover is successful.

    If the switchover is abnormal, contact Huawei engineers for troubleshooting.

Translation
Download
Updated: 2019-06-30

Document ID: EDOC1100044373

Views: 24668

Downloads: 74

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next