Technical Counters for Basic Management
Indicator |
Value |
Unit |
Description |
---|---|---|---|
Maximum number of current alarms |
20,000 |
- |
- |
Maximum number of historical alarms |
5 million |
- |
- |
Maximum number of event alarms |
1 million |
- |
- |
Maximum number of audit logs |
1 million |
- |
Total number of security, operation, and system logs |
Alarm handling |
10 |
Alarms/second |
eSight can process 10 alarms per second consecutively, and process 100 alarms per second during the alarm storm period for a maximum of 15 minutes. If the alarm processing capability exceeds the threshold, alarms may be reported with a delay or get lost. |
Maximum number of topology objects supported by a subnet |
500 |
- |
- |
Maximum number of topology object layers supported by topology management |
11 |
Layer |
- |
Online web clients |
1000 |
- |
- |
Number of online users |
100 |
- |
- |