No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

eSight V300R010C00SPC200, 300, and 500 Self-Service Integration Guide 11

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying Configurations

Verifying Configurations

This section describes how to check whether the northbound FTP interface is configured successfully.

Verifying Active File Upload of the eSight (push)

In the nbi.xml file, the value of the IsPush configuration item is 1. Perform the following steps to verify the configuration:

  1. Wait at least one period for generating topology resource files and check whether related files exist in the directory that is specified by the NBIFileStoragePath configuration item in the nbi.xml file.

    If no file exists, check the configuration and ensure that topology resource files are generated properly.

  2. Start the third-party system FTP server and ensure that its IP address, port ID, user name and password are the same as those configured in the nbi.xml file.
  3. On the third-party system FTP server, check whether topology resource files exist in the directory that is specified by the NMSTopologyFilePath configuration item in the nbi.xml file.

If topology resource files exist, the eSight northbound FTP interface is configured successfully.

Verifying Active File Obtaining of the third-party system (pull)

In the nbi.xml file, the value of the IsPush configuration item is 0. Perform the following steps to verify the configuration:

  1. Use an FTP client to log in to the eSight FTP server.
  2. Download topology resource files from the northbound FTP server.
  3. Decompress the downloaded topology resource file package and view resource information.

If the resource information is correct, the eSight northbound FTP interface is configured successfully.

Download
Updated: 2019-12-13

Document ID: EDOC1100044386

Views: 21336

Downloads: 93

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next