Disk Encryption User Guide

OceanStor Dorado V3 Series V300R002

This document is applicable to OceanStor Dorado3000 V3, Dorado5000 V3, Dorado6000 V3 and Dorado18000 V3. This document introduces how to install and configure key management servers connected to the storage systems that use self-encrypting disks.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Hardware Deployment

Hardware Deployment

This section describes how to install key management servers, connect their cables, and power on the servers.

Prerequisites

  • The installation positions of the two key management servers have been determined.
  • Cables and tools required for hardware installation have been prepared, including:
    • Serial cable (included in the product package)
    • Power cable (included in the product package)
    • Network cable (not included in the product package)
    • Phillips screwdriver (not included in the product package)
    • (Optional) USB-to-serial cable (not included in the product package)
NOTE:

Prepare the USB-to-serial cable if the maintenance terminal has no serial port.

Procedure

  1. Determine the installation positions.

    The key management servers must be installed on standard 19-inch racks. Determine proper positions on the rack to install the two key management servers. Ensure that there is enough space in front of and behind the servers for cable routing and connection, ventilation, and maintenance.

  2. Wear ESD gloves and ESD wrist straps.
  3. Unpack the key management server.
  4. Install the key management server on the rack.
  5. Use a network cable to connect the eth1 port of the key management server to the management network port of the storage system through a switch.
  6. Insert one end of the power cable to the electric socket at the server back, and insert the other end to the external AC power module.
  7. Press the power switch on the front panel.
  8. Put the baffle plate on the front panel, then insert and turn the key.
  9. Repeat 3 to 8 to install and power on the other key management server.
  10. If the maintenance terminal has no serial port, use the USB-to-serial cable to connect the USB port of the maintenance terminal to the serial port of the key management server.
Translation
Download
Updated: 2019-07-17

Document ID: EDOC1100049141

Views: 9374

Downloads: 63

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next