No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage OBS 7.0 Parts Replacement 05

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Removing the Chassis Cover of a 2288H V5 12-Slot Node, TaiShan 2280 12-Slot Node, or TaiShan 2280 V2 12-Slot Node

Removing the Chassis Cover of a 2288H V5 12-Slot Node, TaiShan 2280 12-Slot Node, or TaiShan 2280 V2 12-Slot Node

  1. Loosen the handle screw of the chassis cover using a flat-head screwdriver, as shown in step 1 in Figure 24-7.

    Figure 24-7 Removing a chassis cover

  2. Pull out the handle to push the chassis cover backwards, as shown in step 2 in Figure 24-7.
  3. Lift the chassis cover, as shown in step 3 in Figure 24-7.
Translation
Download
Updated: 2019-07-05

Document ID: EDOC1100051325

Views: 4866

Downloads: 2

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next