No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage OBS 7.0 Hardware Installation Guide 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking a Third-Party Cabinet

Checking a Third-Party Cabinet

If a device is to be installed to a cabinet provided by a third party, you must check the cabinet to ensure that it meets device installation conditions.

Before hardware installation, a third-party cabinet provided by a user must be checked by both the user and a Huawei hardware installation engineer to ensure that it meets device installation and operation requirements. Table 7-1 lists the check items.

Table 7-1 Check items for a third-party cabinet

Category

Check Item

Condition

Remarks

Ground bearing of the equipment room

Not smaller than 600 kg per square meter

□Yes □No

-

Cabinet parameters

The mechanical structure and size comply with IEC 60297 482.6 mm (19") standards.

□Yes □No

The size meets standards shown in Figure 7-1.

Depth ≥ 1000 mm

□Yes □No

-

Available installation space (U)

__________

Indicates the space that is available for installing a Huawei device. Each 2288H V5 12-slot node, TaiShan 2280 12-slot node, or TaiShan 2280 V2 12-slot node requires 2 U space. Each 5288 V5 36-slot node, TaiShan 5280 36-slot node, or TaiShan 5280 V2 36-slot node requires 4 U space.

Cabinet bearing capacity ≥ 600 kg

□Yes □No

It can hold devices that are loaded.

Guide rail (tray) bearing capacity ≥ 50 kg

□Yes □No

-

Shape of holes on a mounting bar

□ Square hole (side length ≥ 9.5 mm x 9.5 mm)

□ Round hole (diameter ≥ Ф 7 mm)

-

Distance between the front mounting bar and the front door ≥ 100 mm

□Yes □No

-

600 mm ≤ distance between the front and rear mounting bars ≤ 900 mm

□Yes □No

If a cabinet has guide rails or trays, skip this item.

Distance between the front mounting bar and rear door ≥ 700 mm

□Yes □No

-

Porosity for front and rear doors > 50%

□Yes □No

-

Door open angle ≥ 120º

□Yes □No

A small door open angle hinders loading, unloading, and maintaining devices.

Device support parts (guide rail or tray) occupy cabinet space.

□Yes □No

If Yes is selected, count the space occupied by support parts into the internal available space of a cabinet. For example, space required for each 2288H V5 12-slot node, TaiShan 2280 12-slot node, or TaiShan 2280 V2 12-slot node increases to 3 U, and that for each 5288 V5 36-slot node, TaiShan 5280 36-slot node, or TaiShan 5280 V2 36-slot node increases to 5 U.

No part protrudes into device installation areas to affect device installation.

□Yes □No

Protruding parts include cabinet mechanical parts, power cable plugs, and PDUs.

Cabinet power system

The cabinet supports dual power input.

□Yes □No

-

AC power nominal voltage (V)

□ 220 V AC

□ 110 V AC

Both 110 V AC and 220 V AC are supported.

Current of each channel of AC power (A)

__________

Refer to single device power consumption and device quantity.

Number of power sockets available for each channel of each cabinet

__________

Each node and each switch require 1+1 power supply. A KVM requires one power supply.

Power socket type

□ IEC standards

□ PRC standards

□ USA standards

□ UK/Singapore/Hong Kong standards

□ Australia standards

□ France standards

□ Germany standards

□ Others_______

Generally, each node is equipped with two standard power cables and two PDU power cables. The cabinet must be equipped with a standard three-pin socket or C13 port. If the onsite situation fails to meet this condition, figure out other solutions to resolve the problem.

Ground point

□Yes □No

M6 screws are required for the ground points in a 19" standard cabinet.

NOTE:

TaiShan 2280 V2 12-slot nodes and TaiShan 5280 V2 36-slot nodes are applicable to FusionStorage OBS 7.0.1 and later versions.

Figure 7-1 Mechanical structure and size requirements for IEC 60297 482.6 mm (19 in.) series cabinet
Translation
Download
Updated: 2019-07-17

Document ID: EDOC1100051333

Views: 16947

Downloads: 22

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next