No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage OBS 7.0 Hardware Installation Guide 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Typical Configurations of a TaiShan 2280 12-Slot Node or TaiShan 2280 V2 12-Slot Node

Typical Configurations of a TaiShan 2280 12-Slot Node or TaiShan 2280 V2 12-Slot Node

This section introduces the cabinet configurations of TaiShan 2280 12-slot nodes and TaiShan 2280 V2 12-slot nodes on 10GE networks. The following uses a TaiShan 2280 12-slot node as an example.

NOTE:

TaiShan 2280 V2 12-slot nodes are applicable to FusionStorage OBS 7.0.1 and later versions.

Overall Configuration

Figure 14-9 and Figure 14-10 show configurations of TaiShan 2280 12-slot nodes in the multi-cabinet scenario with AC power.

Figure 14-9 Typical configurations of TaiShan 2280 12-slot nodes in the multi-cabinet scenario with AC power (where front and back ends use separate switches)
Figure 14-10 Typical configurations of TaiShan 2280 12-slot nodes in the multi-cabinet scenario with AC power (where front and back ends share switches)

Power Distribution

Figure 14-11 and Figure 14-12 show AC power distribution of TaiShan 2280 12-slot nodes in the multi-cabinet scenario.

Figure 14-11 AC power distribution of TaiShan 2280 12-slot nodes in the multi-cabinet scenario (where front and back ends use separate switches)

Figure 14-12 AC power distribution of TaiShan 2280 12-slot nodes in the multi-cabinet scenario (where front and back ends share switches)
Translation
Download
Updated: 2019-07-17

Document ID: EDOC1100051333

Views: 16900

Downloads: 22

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next