No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage OBS 7.0 Hardware Installation Guide 07

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing a Filler Panel in a Cabinet

Installing a Filler Panel in a Cabinet

After installing devices and cables, you need to install filler panels for empty slots to ensure efficient electromagnetic shielding, sufficient ventilation, outstanding dust-proof performance, and neat appearance.

Prerequisites

  • Devices have been installed in the cabinet.
  • Cables have been connected between devices.

Procedure

  1. Use 1 U or 2 U filler panels based on the height of the vacant slots in the cabinet.
  2. Align the snap-in connectors at both sides of a filler panel with the mounting bars of the cabinet, and press the snap-in connectors with proper force until the filler panel snaps into place on the mounting bars, as shown in Figure 12-1.

    Figure 12-1 Installing a filler panel in the cabinet

Translation
Download
Updated: 2020-01-03

Document ID: EDOC1100051333

Views: 22564

Downloads: 28

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next