No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionStorage OBS 7.0 Hardware Installation Guide 06

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing PGND Cables and Power Cables Between Components in a Cabinet

Installing PGND Cables and Power Cables Between Components in a Cabinet

About This Chapter

After components in a cabinet are connected through PGND cables and power cables, they can be correctly grounded and powered.

Translation
Download
Updated: 2019-07-17

Document ID: EDOC1100051333

Views: 17157

Downloads: 22

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next