NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking the Power Supply Systems in the Equipment Room

Checking the Power Supply Systems in the Equipment Room

Power supply systems, including AC power supply, DC power supply, and storage batteries, in the equipment room must meet the anticipated requirements.

Check that the power supply systems in the equipment room meet the following requirements:

  • The AC power supply facilities must be complete. The AC power supply must meet the anticipated requirements. Besides the AC power lead-in wires, a diesel generator that supplies standby power must also be available.
  • The DC power distribution unit must meet the anticipated requirements and the voltage must be stable. The power output must be within the specified range.
  • Batteries with sufficient capacity must be available to ensure uninterrupted running of the device during a power failure.
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40776

Downloads: 292

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next