Preparing for the Installation
Before installing the hardware, prepare the technical documents, tools and meters, arrange for experienced installation engineers, check the installation environment, and perform the unpacking check.
- Preparing for Installation
This section describes the technical documents, tools and meters that need to be available before the installation. It also describes the skills that the installation engineers must possess, and the requirements that the installation engineers must meet. - Checking the Installation Environment
This section describes the requirements for the installation environment. - Environmental Requirements for Device Storage
- Environmental Requirements for Device Transport
- Environmental Requirements for Device Operation
This chapter describes the environmental requirements for device operation, including the requirements for the environment of the equipment room and power supply. - Standard Compliance
- Unpacking and Checking the Products
This section describes the procedure and precaution for unpacking and checking the products after the engineering is started. - Checking the Boards