NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the NE40E-X16A in a Cabinet

Installing the NE40E-X16A in a Cabinet

  • The NE40E-X16A is heavy. We recommend you use a mechanical lift to lift and move the device.
  • Before moving the device into a cabinet, remove the filler panels and fan assemblies from the device to reduce the weight, as shown in Figure 8-2 and Figure 8-3. Extra care should be taken to prevent damaging slot connectors.
  • Remove the air intake frame from the device before installing the device into the cabinet to avoid damaging the air intake frame, as shown in Figure 8-4.
  • Use only the lifting handles at both sides of the device to slightly lift and move the chassis, as shown in Figure 8-5. Do not use handles on any of the boards or components.
  • Do not step on the air filter at the bottom of the cabinet when installing the device.
Figure 8-2 Removing filler panels

Figure 8-3 Removing fan assemblies

Figure 8-4 Removing the air intake frame

Figure 8-5 Handles for moving the device

  1. Install guide rails.
    Figure 8-6 Installing guide rails

    If you use a third-party cabinet, you can install adjustable guide rails in the cabinet. Fix the guide rails into the mounting bar through the positioning pins at the front and rear ends of the guide rails. Then, fix the front and rear ends through M6 screws.

    NOTE:
    • Identify the left and right guide rails, and the front and rear ends of each guide rail according to the L/F and R/F flags on the guide rails. Install the guide rails in the correct direction.
    • Ensure that the front and rear ends of each guide rail are on the same horizontal plane.
    • The third-party cabinet you use must meet the following requirements:

      • It must be a 19 inch cabinet that meets the IEC standard.
      • The installation surface of the cabinet must have a mounting hole with dimensions no less than 9.0 mm * 9.0 mm (0.354 in. * 0.354 in.).
      • Distance between front and rear mount bars: 500-850 mm (19.68-33.46 in.) (21242246).
      • The weight of the chassis applicable to this guide rail is not more than 425 kg.
    Figure 8-7 Installing guide rails to a third-party cabinet

    NOTE:
    • The side with ground screws on top is the rear of a Huawei cabinet.
    • Ensure that the bottom of each guide rail is aligned with the markings on the mounting bar.
    • Ensure that the floating nuts are installed securely so that they will not fall off when they are fastened with screws.
    • Ensure a clearance of 1 U between the guide rails and the bottom of the cabinet. (1 U = 44.45 mm)
  2. Use a measuring tape to measure and locate the positions for mounting ear screws on mounting bars. Install floating nuts in these positions.
    Figure 8-8 Installing floating nuts

  3. Place the NE40E-X16A on the guide rails and slide the chassis into the cabinet. Put M6 panel screws into the floating nuts and fasten the screws to secure the chassis.
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 43257

Downloads: 316

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next