No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Requirements on Customers' Cabinets Purchased from Other Vendors

Requirements on Customers' Cabinets Purchased from Other Vendors

Installing the chassis in a Huawei N68E cabinet is recommended. If you purchase a cabinet from other vendors, ensure that the cabinet meets the following conditions:

  1. The depth of the cabinet is greater than 800 mm (31.50 in.).
  2. The distance (L) is 90 mm to 125 mm back from the inner side of the front door of the cabinet.
    Figure 13-9 Right view of the cabinet

  3. The porosity of the front and rear door surfaces must be greater than 50%.
  4. The cabinet has installation accessories, such as guide rails, floating nuts, and screws.
  5. The cabinet has a ground point to connect to the chassis.
  6. Both the front and rear doors of the cabinet can be opened for maintenance.
  7. The cabinet has an opening for cables in the top and bottom.
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40532

Downloads: 288

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next