- About This Document
- Preparing for the Installation
- Preparing for Installation
- Checking the Installation Environment
- Environmental Requirements for Device Storage
- Environmental Requirements for Device Transport
- Environmental Requirements for Device Operation
- Requirements for Selecting a Site for an Equipment Room
- Equipment Room Layout
- Construction Requirements for the Equipment Room
- Climatic Requirements
- Air Cleanliness Requirements
- Mechanical Stress Requirements
- Requirements for Handling Corrosive Gases
- Requirements for ESD Prevention
- Electromagnetism Requirements for the Equipment Room
- Requirements for Lightning-Proof Grounding
- Lighting in the Equipment Room
- Dust Resistance and Water Resistance
- Requirements for Power Supply
- Standard Compliance
- Unpacking and Checking the Products
- Checking the Boards
- Cables
- On-site Cable Assembly and Installation
- Equipment Grounding Specifications
- Labels for Cables
- Powering on Devices
- Installing NE40E-X16A
- Specifications and Components of the NE40E-X16A
- Installation Preparations
- Typical Misoperation Cases
- Installation Guidelines
- Environmental Requirements for the Installation Site
- Cabinet Specifications
- Installation Preparations
- Installing the NE40E-X16A in a Cabinet
- Installing Ground Cables
- DC Power Distribution
- 240V/380V HVDC Power Distribution
- AC Power Distribution
- Installing Boards and Subcards
- Installing Network Cables
- Installing Optical Fibers
- Checking Installation
- Power-on Check
- Installing NE40E-X16
- Introduction to the NE40E-X16
- Precautions
- Equipment Mishandling
- Installation Instructions
- Environmental Requirements for the Installation Site
- Requirements for Cabinets from Other Vendors
- Required Tools and Meters
- Installing the NE40E-X16 in a Cabinet
- Installing Ground Cables
- DC Power Distribution
- AC Power Distribution
- Installing Boards and Subcards
- Installing Network Cables
- Installing Optical Fibers
- (Optional) Connecting Sensors to the CMU
- Installation with Subfloor Cabling
- Installation Checklists
- Post-Startup Checklist
- Installing NE40E-X8A
- Introduction to the NE40E-X8A
- Precautions
- Typical Misoperation Cases
- Installation Instructions
- Environmental Requirements for the Installation Site
- Requirements on Customers' Cabinets Purchased from Other Vendors
- Installation Preparations
- Installing the NE40E-X8A in a Cabinet
- Installing the NE40E-X8A in a 23-inch Rack in North America
- Installing the NE40E-X8A in a 19-inch Rack in North America
- Installing the Ground Cable
- DC Power Distribution
- 240V/380V HVDC Power Distribution
- AC Power Distribution
- Installing Boards and Subcards
- Installing Network Cables
- Installing Optical Fibers
- Checking After Installation
- Power-on Check
- Installing NE40E-X8
- Introduction to the NE40E-X8
- Precautions
- Typical Misoperation Cases
- Installation Instructions
- Environmental Requirements for the Installation Site
- Requirements on Customers' Cabinets Purchased from Other Vendors
- Installation Preparations
- Installing the NE40E-X8 in a Cabinet
- Installing the Ground Cable
- DC Power Distribution
- AC Power Distribution
- Installing Boards and Subcards
- Installing Network Cables
- Installing Optical Fibers
- (Optional) Connecting Sensors to the CMU
- Installations with Subfloor Cabling
- Checking After Installation
- Post-Startup Checklist
- Installing NE40E-X3A
- Introduction to the NE40E-X3A
- Installation Preparations
- Environmental Requirements for the Installation Site
- Typical Misoperation Cases
- Installation Instructions
- Requirements on Customers' Cabinets Purchased from Other Vendors
- Installation Preparations
- Installing the NE40E-X3A in a Cabinet
- Installing Ground Cables
- DC Power Distribution
- AC Power Distribution
- Installing Boards and Subcards
- Installing Network Cables
- Installing Optical Fibers
- Installation with Subfloor Cabling
- Checking After Installation
- Post-Startup Checklist
- Installing NE40E-X3
- Introduction to the NE40E-X3
- Installation Preparations
- Environmental Requirements for the Installation Site
- Typical Misoperation Cases
- Installation Instructions
- Requirements on Customers' Cabinets Purchased from Other Vendors
- Installation Preparations
- Installing the NE40E-X3 in a Cabinet
- Installing Ground Cables
- DC Power Distribution
- AC Power Distribution
- Installing Boards and Subcards
- Installing Network Cables
- Installing Optical Fibers
- Installation with Subfloor Cabling
- Checking After Installation
- Post-Startup Checklist
- Installing DPD125-12-24 DC Power Distribution Box
- Installing the APD63-4-12 DACS into a Cabinet