No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Introduction to the NE40E-X8

Introduction to the NE40E-X8

Device Components

The following figure shows the front view of the NE40E-X8.

Figure 11-1 Front view of the NE40E-X8

The following figure shows the rear view of the NE40E-X8.

Figure 11-2 Rear view of the NE40E-X8

The following table lists main components of the NE40E-X8.

No.

Component

Quantity

1

Air intake vent

1

2

MPU slot

2

3

SFU slot

1

4

LPU slot

8

5

Front cable tray

1

6

Fan module

2

7

Filler Panel

2

8

Ground terminal

1

9

Rear cable tray

2

10

Power monitoring module

1

11

DC power entry module (PEM)

4

12

Handle

4

13

Mounting ear

2

Air flow of the NE40E-X8

Engineers must have access to both the front and rear of an NE40E-X8. Do not place the rack against a wall. Leave an aisle of more than 76 cm (2.49 ft.) for maintenance access.



Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40325

Downloads: 286

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next