No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing Network Cables

Installing Network Cables

Before bundling network cables, use a network cable tester to test cable connectivity.

NOTE:
  • The clearance between the power cable, ground cable, and signal cable must be more than 30 mm (1.18 in.) each.
  • Bundle the network cables in a rectangular shape. Ensure that the cable ties are evenly spaced and face the same direction

To install network cables, perform the following steps:

  1. Attach temporary labels to both ends of each network cable.
  2. Route network cables along the cable tray and connect them to the corresponding interfaces, as shown in 1 in Figure 11-23.
  3. Use a network cable tester to test the connectivity of network cables.
  4. Use cable ties every 150 mm (5.91 in.) to bundle and secure cables to the cable tray.
  5. Attach permanent labels 20 mm (0.79 in.) from both ends of each network cable, as shown in 2 in Figure 11-23.
    Figure 11-23 Installing network cables

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 39351

Downloads: 283

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next