No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Preparing Tools and Meters

Preparing Tools and Meters

The owner of installation needs to arrange the tools and meters for hardware installation.

Tools



Diagonal pliers



Phillips screwdriver



Flathead screwdriver



Adjustable wrench



Heat gun



Marker



Ladder



Multimeter



ESD-preventive gloves



ESD-preventive wrist strap



Utility knife



Wire stripper



Wire clippers



RJ45 crimping tool



Power cable crimping tool



Hydraulic pliers

Installation Related Material
  1. PVC black insulation tape
  2. Tie wrap
  3. Binding tape
  4. Heat-shrink tube
  5. Corrugated pipe
  6. Label
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40861

Downloads: 292

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next