No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installation Preparations

Installation Preparations

Tools and Meters

This section describes the tools and meters that need to be available at the time of installation.

The installation supervisor is responsible for arranging the tools and meters required for the hardware installation.



Diagonal pliers



Phillips screwdriver



Flat-head screwdriver



Level



Adjustable wrench



Marker



Ladder



Network cable tester



Hot air gun



ESD gloves



ESD wrist strap



Torque batch



Multimeter



Utility knife



Wire stripper



Vacuum cleaner



Wire clipper



RJ45 crimping tool



Power cable crimping tool



Plumb line



Hydraulic pliers



Protective gloves



Socket wrench



Crimping tool



Hammer drill



Measuring tape



Torque wrench



Hammer

Installation related materials

Black PVC insulation tape

Cable ties

Binding tape

Heat shrink tubes

Corrugated pipes

Labels

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 43432

Downloads: 319

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next