No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking the Equipment Room Environment

Checking the Equipment Room Environment

To ensure good working conditions for the device, take related measures so that the equipment room environment meets the requirements for proper device operation.

Check that the equipment room environment meets the following requirements:

  • The lighting system, including main lighting, backup lighting and emergency lighting must meet anticipated requirements.
  • The water supply and drainage systems must comply with the fire control regulations.
  • The air-conditioning system must be able to maintain appropriate temperature and humidity conditions in the equipment room.
  • The fire control facilities must be intact and function normally.
  • The earthquake-resistance level of the equipment room must meet anticipated requirements.
  • The floor in the equipment room must be sturdy enough to support the cabinets.
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 39390

Downloads: 283

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next