No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
X8A Power Distribution Instance

X8A Power Distribution Instance

This section describes some power distribution instances.

NOTE:
The number of each PEM module can be determined based on a product silkscreen and the primary and secondary power supply diagram.

To ensure power supply backup, connect PEM-As to the OUTPUT A area in the power distribution box, and connect PEM-Bs to the OUTPUT B area in the power distribution box.

Mapping between input lines and output lines in the power distribution box

Figure 14-2 Mappings between 4-channel inputs and 12-channel outputs no copper fitting

Figure 14-3 Mappings between 8-channel inputs and 16-channel outputs with copper fitting

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 39997

Downloads: 286

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next