No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking Installation

Checking Installation

Cabinet Installation Checklist

No.

Requirement

1

The cabinet is in the correct location.

2

The cabinet is properly placed with a horizontal/vertical deviation of no more than 3 mm (0.12 in.).

3

All bolts and screws are firmly fastened, especially on electrical connections. Flat and spring washers are used with each bolt, and spring washers are placed on the top of flat washers.

4

The cabinet is neat and clean.

5

Cabinet doors can be opened and closed smoothly.

6

All labels, tags, and nameplates are correct, legible, and complete.

Device Environment Checklist

No.

Requirement

1

No fingerprints or smears exist on the device.

2

There are no unnecessary electrical tapes or cable ties on cables.

3

No electrical tapes, cable ties, wastepaper, or packing bags are left around the device.

4

All other items around the device are organized, neat, and clean.

Electrical Connection Checklist

No.

Requirement

1

All assembled PGND cables are copper-based with proper wire diameters. Cables meet quality standards.

2

All ground cables, AC input cables, and intra-cabinet cables are connected correctly according to the wiring diagram, and all screws are tightened. The input and output cables are not short-circuited.

3

Any redundant parts of power cables or PGND cables are trimmed off and not coiled.

4

The terminals at both ends of each power cable or PGND cable are crimped securely.

5

The wiring terminals on cables are wrapped tightly using PVC insulation tapes or heat shrink tubes.

6

The wiring terminals with heat shrink tubes are heated using a heat gun.

7

Flat and spring washers are properly installed on each bolt of a wiring terminal.

8

All cables, especially the cables in the lower area of the cabinet, are securely connected.

9

Cables are properly bound. Cable ties are installed at equal spacing and in the same direction.

10

Power and ground cables are bound separately from other cables.

11

The cable layout accounts for easy maintenance and expansion in the future.

12

The labels at both ends of each cable are correct, legible, and complete.

13

Excess cable ties are trimmed off.

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40543

Downloads: 288

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next