No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Structure

Structure

75-ohm Clock Cable

Figure 3-33 shows the structure of the 75-ohm clock cable.

Figure 3-33 75-ohm clock cable



1. Coaxial connector-SMB 2. Label

120-ohm trunk cable

The 120-ohm trunk cable adopts the RJ-45 connector. Figure 3-34 shows the structure of the 120-ohm trunk cable.

Figure 3-34 120-ohm trunk cable

Table 3-16 shows the pin assignments on the 120-ohm trunk cable.

Table 3-16 Pin assignments of the 120-ohm trunk cable

Connector X1

Connector X2

Relationship

X1.5

X2.2

Twisted

X1.4

X2.1

X1.2

X2.5

Twisted

X1.1

X2.4

X1.3

X2.7

Twisted

X1.6

X2.8

X1.7

X2.3

Twisted

X1.8

X2.6

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40782

Downloads: 292

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next