No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
X8A Distribution Instance

X8A Distribution Instance

NOTE:
The number of each PEM module can be determined based on a product silkscreen and the primary and secondary power supply diagram.

Mappings Between Input Channels and Output Channels in the Power Distribution Box

Figure 15-10 Mappings between input channels and output channels in the power distribution box

NOTE:
AC/AC1 and AC/AC2 are used as an example. The outputs of the two modules are single-phase A1_L1/N/PE and single-phase B1_L1/N/PE, respectively. A and B back up each other.

NE40E-X8A Equipped with Eight PMs

PEM1-A1 and PEM1-A2 are connected to the PDB's AC/AC1 and AC/AC2, respectively. PEM1-B1 and PEM1-B2 are connected to the PDB's AC/AC7 and AC/AC8, respectively.

PEM2-A3 and PEM2-A4 are connected to the PDB's AC/AC3 and AC/AC4, respectively. PEM2-B3 and PEM2-B4 are connected to the PDB's AC/AC9 and AC/AC10, respectively.

Figure 15-11 Power distribution diagram of the NE40E-X8A

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40903

Downloads: 292

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next