No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Introduction to the NE40E-X16

Introduction to the NE40E-X16

Components



The following table lists main components of the NE40E-X16.

No.

Component

Quantity

1

Air intake vent

2

2

MPU slot

2

3

Front cable management tray

2

4

SFU slot

4

5

LPU slot

16

6

Handle

5

7

Mounting ear

4

8

Fan module

4

9

Filler Panel

4

10

DC power entry module (PEM)

8

11

Rear cable management tray

4

12

Power monitoring module

1

13

Ground terminal

1

Air flow of the NE40E-X16

Engineers must have access to both the front and rear of an NE40E-X16. Do not place the rack against a wall. Leave an aisle of more than 76 cm (2.49 ft.) for maintenance access.



Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 39511

Downloads: 286

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next