NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
AC Power Distribution

AC Power Distribution

Never install power cables when the power is on.

NOTE:
  • If only AC power is available, the NE40E-X8 requires an AC-DC converter EPS200-4850A/4850B.
  • The EPS200-4850A/4850B and the NE40E-X8 are installed in the same cabinet.
  • If you do not use Huawei power cables, select suitable power cables according to the local cable standards.

EPS200-4850A/4850B

The following figure shows the EPS200-4850A/4850B.

Figure 11-12 EPS200-4850A

Figure 11-13 EPS200-4850B

The following table lists the power cable specifications.

Table 11-4 Power cable specifications

Item

Specification

BOM number

Remark

AC power cable

6 mm2 (10 AWG) - Black Jacket (Cores: Blue, Brown) , 43 A, 2 Equivalent Cores

25030461

-

OT terminal

6 mm2 (10 AWG) -M6 single-hole OT naked crimping terminal

14170023

It is connect to the EPS200-4850A

6 mm2 (10 AWG) -M8 single-hole OT naked crimping terminal

14170013

It is connect to the PDF

25 mm2 (4 AWG)–M6 double-hole OT2 naked crimping terminal

14170119

Ground cable terminal of the EPS200-4850A

25 mm2 (4 AWG)–M6 single-hole OT naked crimping terminal

14170147

It is connect to the ground bar in the equipment room

DC power cable

16 mm2 (6 AWG)

25030430

Blue DC power cable

25030428

Black DC power cable

Ground cable

25 mm2 (4 AWG)

25030431

Ground cable of the EPS200-4850A

Monitor and Alarm Cable

Monitor and Alarm Cable, 3 m, D9M, CC4P0. 48B(S), D9M

04080076

-

NOTE:

If the distance from an AC chassis to an AC PDF is longer than 20 m (65.62 ft.), an AC PDF or power distribution cabinet must be deployed near the device.

Installing the EPS200-4850As

NOTE:
  • This section uses the installation of two EPS200-4850As into a cabinet as an example.
  • The upper EPS200-4850A should be 2 U (3.5 in.) below from the top of the cabinet. Allow 1 U (1.75 in.) clearance between the upper and lower EPS200-4850As.

To install EPS200-4850As, perform the following steps:

  1. Install guide rails, as shown in 1 in Figure 11-14.
  2. Install floating nuts in the first and sixth holes on the mounting rail counting from the bottom of the guide rail, as shown in 2 in Figure 11-14.
  3. Install the EPS200-4850As, and secure them to the cabinet using M6 screws, as shown in 3 and 4 in Figure 11-14.
    Figure 11-14 Installing the EPS200-4850As

  4. Install ground cables.
    Figure 11-15 Installing the ground cables for the EPS200-4850As

    NOTE:

    The ground cables of the EPS200-4850As should be connected to the ground bar in the equipment room.

  5. Install the monitoring cables.
    Figure 11-16 Installing the monitoring cables for the EPS200-4850As

Cable Connections Between a PEM and EPS200-4850A

Connect a PEM to an EPS200-4850A as shown in the following figure.

The following figure shows cable connections between a PEM and EPS200-4850A.

Figure 11-17 Cable connections between a PEM and EPS200-4850A

Installing Power Cables

To install power cables, perform the following steps:

  1. Attach temporary labels to both ends of each power cable.
  2. Route AC power cables along the cable ladder and connect them to the input terminals of the EPS200-4850A, as shown in 1 in Figure 11-18. Connect the other end of each power cable to the PDF in the equipment room.
  3. Connect the output terminals of the EPS200-4850A to the input terminals of the PEM, as shown in 2 in Figure 11-18.
  4. Re-install plastic covers on power modules' connection boxes.
  5. Use cable ties to bundle the cables every 150 mm (5.91 in.) upwards from the bottom end and secure the cables to the cable tray.
  6. Attach permanent labels 20 mm (0.79 in.) from both ends of each power cable.
    Figure 11-18 Installing power cables

Installing a Three-Core AC Power Cable

To install a three-core AC power cable, perform the following steps:

  1. Remove a specific length of the cable sheath and cut the PE wire (yellow-and-green) at the point where the cable sheath is removed (you can wrap the exposed PE wire with a PVC insulation tape to prevent electricity leakage or short circuit). Then, remove the sheath of the L wire (brown) and that of the N wire (blue) and crimp the OT terminals.

  2. Connect the L wire and N wire respectively to the L and N input OT terminals on the AC power distribution box.

    NOTE:

    If an AC power cable has two L wires and one N wire, perform the following steps:

    • When 110 V power supply (two L wires) is provided, connect two L wires to the L and N input terminals (OT terminals). Follow the procedure for cutting the PE wire to cut the N wire.
    • When 220 V power supply (one L wire and one N wire) is provided, connect the L wire and N wire to the L and N input terminals (OT terminals) on the AC Power distribution box, respectively. Follow the procedure for cutting the PE wire to cut the other L wire.
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 40015

Downloads: 286

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next