No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installation Guidelines

Installation Guidelines

About This Document

This document provides guidelines for quick hardware installation of the NE40E-X16A. It does not describe pre-delivery assembly.

Key Points for the Installation

  • Allow a clearance of more than 1100 mm (39.89 in.) in front of and behind the NE40E-X16A for maintenance.
  • The side with the grounding identifier is the back of the cabinet. The ground cable must connect to the terminal on the back of the cabinet.

Installation Flowchart

NOTE:

The NE40E-X16A has both AC and DC chassis. Distribute power for the NE40E-X16A as required. For details, see DC Power Distribution or AC Power Distribution in this document.

Figure 8-1 Installation flowchart

Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 51294

Downloads: 380

Average rating:
This Document Applies to these Products

Related Version

Related Documents

Share
Previous Next