No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installation with Subfloor Cabling

Installation with Subfloor Cabling

NOTE:
  • Subfloor cabling is applicable when the NE40E-X16 is installed on an ESD floor.
  • For details on installations with subfloor cabling, see installations with overhead cabling. The following figures show how cables are routed in installations with subfloor cabling.
  • For both overhead and subfloor cabling, the ground cable for a cabinet is connected to the ground point on the top of the cabinet.

DC Power Distribution



AC Power Distribution



Installing Network Cables



Installing Optical Fibers



Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 44190

Downloads: 332

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next