NE40E V800R010C10SPC500 Installation Guide

This is NE40E V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Checking the Other Facilities

Checking the Other Facilities

Check that the other facilities meet the following requirements:

  • The maintenance and monitoring room must be neat, clean, and uncluttered.
  • An electrostatic discharge (ESD) PC workbench must be used and must be located in the position as defined in the floor plan for the equipment room.
  • The maintenance terminal and the accessory devices must be correctly identified and be intact. The installation positions of these devices must comply with the design requirements.
Translation
Download
Updated: 2019-01-03

Document ID: EDOC1100055059

Views: 39453

Downloads: 286

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next