No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

NE40E-M2 V800R010C10SPC500 Installation Guide

This is NE40E-M2 V800R010C10SPC500 Installation Guide
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing the NE40E-M2 into a 21-inch N63B Cabinet

Installing the NE40E-M2 into a 21-inch N63B Cabinet

NOTE:
  • The Huawei N63B cabinet is used as an example here. For installation methods of another cabinet, see Rack-Mounting Ear and Cable Tray Installation Guide.
  • Before installing the NE40E-M2 into a cabinet, connect the ground cable to the chassis. You cannot connect the ground cable to the grounding terminal on the side panel of the chassis when the chassis is installed in the cabinet.
  • The cross-sectional area of a ground cable should be 10 mm^2.
  1. Locate the position of the NE40E-M2 in the cabinet and install floating nuts on mounting bars.
    Figure 8-3 Floating nut installation

  2. Remove the front rack-mounting ear of the NE40E-M2 and install it in the middle of the chassis.
    Figure 8-4 Rack-mounting ear installation

  3. Prolong the rack-mounting ear.
    Figure 8-5 Rack-mounting ear prolonging

  4. Connect the ground cable to the grounding terminal on the side panel of the chassis. Ground the other end of the ground cable after the chassis is installed in the cabinet.
    Figure 8-6 Connecting the ground cable to the side panel of the chassis

  5. Place the chassis on the guide rails of the cabinet and push the chassis in to the cabinet. Use M6 panel screws to secure chassis in the cabinet.
    Figure 8-7 Installing the chassis into the cabinet

  6. Install the cable management tray.
    Figure 8-8 Installing the cable management tray

Download
Updated: 2019-01-02

Document ID: EDOC1100058424

Views: 9294

Downloads: 45

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next