NE40E-M2 V800R010C10SPC500 Installation Guide

This is NE40E-M2 V800R010C10SPC500 Installation Guide
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Installing Network Cables

Installing Network Cables

Before bundling network cables, use a network cable tester to test cable connectivity.

NOTE:
  • The distance between power cables, ground cables, and signal cables must be greater than 30 mm.
  • Bundle the network cables in a rectangle shape. Ensure that the cable ties are evenly spaced and face the same direction.
  • Avoid blocking boards when routing network cables.
  1. Attach temporary labels to both ends of each network cable.
  2. Route network cables along the cable tray and plug them into corresponding interfaces.
  3. Use a network cable tester to test the connectivity of network cables.
  4. Use cable ties to bundle network cables at an interval of 150 mm and fasten the network cables to the rack.
  5. Attach permanent labels 20 mm from both ends of each network cable.
    Figure 8-17 Installing network cables

Download
Updated: 2019-01-02