NE40E-M2 V800R010C10SPC500 Installation Guide

This is NE40E-M2 V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Testing Cable Connectivity

Testing Cable Connectivity

This section describes how to test the cable connectivity by using a multimeter.

Prerequisites

During the process of routing or bundling cables, and installing the connector, the circuit on the cable may become open or broken. Hence, after the preceding procedures are completed, test the connectivity of cables.

Tools, Equipment and Materials

Multimeter

Background Information

In this section, the cable has an Anea 96 connector at one end and a group of SMB connectors at the other, as shown in Figure 4-40. This section describes how to test the cable connectivity by using a multimeter.

Procedure

  1. Set the multimeter to the resistance gear.
  2. On the SMB connector side, connect the two probes of the multimeter to the internal and external conductors respectively.
  3. According to the pin sequence table of the connector, use a shorting stub to cause a short circuit between the two pins corresponding to the SMB connectors. See Figure 4-40.

    Figure 4-40 Testing table connectivity

  4. Observe the multimeter, which should read 0 ohms.
  5. Remove the shorting stub from the connector. Observe the multimeter, which should read resistance of infinite ohms.
  6. Repeat Steps 2-5 to test the other SMB connectors.
Download
Updated: 2019-01-02

Document ID: EDOC1100058424

Views: 9543

Downloads: 49

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next