NE40E-M2 V800R010C10SPC500 Installation Guide

This is NE40E-M2 V800R010C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Device Installation Checklist

Device Installation Checklist

This section provides a checklist for checking an installed device before power-on.

Before power-on, make sure that the switches of all power distribution units (PDUs) and power distribution frames (PDFs) are in the "OFF" state.

Table 7-1 lists the items that need to be checked for the installed device.

Table 7-1 Checklist for the installed device

No.

Check Item and Description

Method

1

The cabinet is placed as required in the design drawing.

Check this according to the engineering design document.

2

The expansion bolts used to fix the cabinet or holder to the ground are fastened firmly. Flat washers and spring washers are used and spring washers are placed on top of flat washers.

Check this according to the following figure.



3

The installation holes on the support and feet are fit for the expansion bolts. The support is insulated from the ground; the floor holder is insulated from the guide rails.

Check this by measuring the megohm range of a multimeter. The resistance of each insulating point must be greater than 5 megohms.



4

The cabinets in the same row are evenly aligned with each other. Rows of cabinets are aligned along the main aisle, with a deviation of up to 5 mm (0.20 in.).

-

5

The accessories on the front and back doors of the cabinet are present. A connecting plate is installed if two cabinets are attached to each other.

-

6

The front door of the cabinet can be opened and closed smoothly.

Check this by unlocking the door according to the following figure.



Check this by locking the door according to the following figure.



7

The boards can be plugged and removed smoothly. Screws on the board panels, if any, are fastened properly. The steel wires on the screws are intact.

-

8

The surfaces of the device are clean and tidy. No component of the cabinet is deformed. Otherwise, it will affect the appearance of the entire device. All labels are correct, clear, and complete.

-

9

The cabinet is clean and there are no dust particles inside the cabinet. There are no extra bundling straps, cable ends, or other foreign objects inside the cabinet.

-

10

The electrostatic discharge (ESD)-preventive wrist strap is inserted into the ESD-preventive hole on the cabinet.

Check this according to the following figure.



11

Blank filler panels are installed in all empty slots.

-

Download
Updated: 2019-01-02

Document ID: EDOC1100058424

Views: 9441

Downloads: 47

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next