No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - VPN 01

NE05E and NE08E V300R003C10SPC500

This is NE05E and NE08E V300R003C10SPC500 Configuration Guide - VPN
Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Verifying the Configuration of an L2VPN to Access Multiple L3VPNs Through Sub-interfaces for VLAN Tag Termination

Verifying the Configuration of an L2VPN to Access Multiple L3VPNs Through Sub-interfaces for VLAN Tag Termination

After an L2VPN accesses multiple L3VPNs through sub-interfaces for VLAN tag termination, you can view the binding relationship between the VE interface and the VE-Group, and termination information on VE sub-interfaces.

Procedure

  • Run the display virtual-ethernet ve-group [ ve-group-id | slot slot-id ] command to check the binding relationship between VE interfaces and a VE-Group.
  • Run the display dot1q information termination [ interface interface-type interface-number [.subinterface-number ] ] command to check the information about the Dot1q termination on VE sub-interfaces.
  • Run the display qinq information termination [ interface virtual-ethernet interface-number.subinterface-number ] command to check information about QinQ termination on VE sub-interfaces.

Example

Run the display virtual-ethernet ve-group command. You can view the VE interfaces in a VE-Group. For example:

<HUAWEI> display virtual-ethernet ve-group
 Ve-groupID    TerminateVE                   AccessVE  
 1               Virtual-Ethernet0/1/0   Virtual-Ethernet0/1/1
Total 1, 1 printed
Run the display dot1q information termination command on the PE. You can view detailed information about Dot1q termination on VE sub-interfaces. For example:
<HUAWEI> display dot1q information termination interface virtual-ethernet 0/1/1
Virtual-Ethernet0/1/1.1
    Total QinQ Num: 1
      dot1q termination vid 10 to 20 vlan-group 1
    Total vlan-group Num: 1
      vlan-group Num:1
    encapsulation dot1q-termination

Run the display qinq information termination command. You can view detailed information about QinQ termination on VE sub-interfaces. For example:

<HUAWEI> display qinq information termination
  Virtual-Ethernet0/1/0.1
    L3VPN bound
    Total QINQ Num: 1
      qinq termination pe-vid 2 ce-vid 20 to 30
    Total vlan-group Num: 0
    encapsulation qinq-termination
Translation
Download
Updated: 2019-01-14

Document ID: EDOC1100058925

Views: 27754

Downloads: 53

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next