Installation Guide

NE05E and NE08E V300R003C10SPC500

This is NE05E and NE08E V300R003C10SPC500 Installation Guide
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Equipment Installation Process

Equipment Installation Process

This section describes the general equipment installation process. Before installing equipment, you need to determine the installation mode according to installation environment. After unpacking and inspecting the equipment, you need to install the chassis, boards, fibers, and cables in sequence, and then check the installation result. After determining that the installation is correct, you can power on the equipment and then check fiber connections.

Table 1-1 lists the general installation process.

Table 1-1 Equipment installation process

Installation Process

Description

Installation preparation

Before installation, plan installation space, build telecommunications rooms, and determine the installation mode according to requirements of the equipment for running environment. This ensures that the equipment can be properly installed and commissioned, and then can run stably. For details on the requirements of the equipment for running environment, see Installation Preparation.

Unpacking and inspecting equipment

When a project starts, the project supervisor needs to work with the customer to unpack and inspect the delivered equipment. For details, see Unpacking Inspection.

Installing chassis

The installation modes for chassis vary with installation environment. For details, see Installing chassis.

Installing boards

Generally, chassis for delivery have boards installed. If boards are delivered separately, see Installing Boards.

Installing fibers and cables

The installation modes for fibers and cables in chassis vary with installation environment.

Testing E1 cable connections

After installing E1 cables, test the E1 cable connections.

Checking installation

After hardware installation is complete, check the installation to ensure that the equipment can run stably.

Powering on the equipment

Before powering on the equipment, check the external power supply to ensure proper voltage and fuse capacity. After powering on the equipment, observe the indicators to determine whether the equipment runs properly.

Checking fiber connections

During installation of fiber jumpers, the fiber jumpers may be incorrectly connected or attenuate much optical power. To avoid impacts on services, check fiber jumper connections after the fiber jumpers are routed from optical interfaces to the optical distribution frame (ODF). For details, see Checking Tail Fiber Connection.

Translation
Download
Updated: 2019-01-14