No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

HUAWEI NIP6800 Series V500 Hardware Guide

This document of the NIP6800 Series describes hardware structure, installation guide, and hardware maintenance. The content of this document includes the appearance and specifications of the product, the supported expansion cards, preparation before the installation, installation, cabling, and hardware replacement.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Surveying the Installation Environment

Surveying the Installation Environment

Before installing the NIP6800, check that the installation environment meets requirements to ensure normal running and maximum service life of the NIP6800.

Table 2-3 lists installation environment check items.

Table 2-3  Installation environment checklist

Check Item

Requirements

Compliance

Site for the Equipment Room

As stated in Equipment Room Site Requirements.

□ Y □ N □ N/A

Construction for the equipment room

As stated in Construction Requirements for the Equipment Room.

□ Y □ N □ N/A

Temperature

As stated in Requirements for Temperature, Humidity, and Altitude.

□ Y □ N □ N/A

Relative humidity

□ Y □ N □ N/A

Altitude

□ Y □ N □ N/A

Neatness

As stated in Dust Requirements.

□ Y □ N □ N/A

Corrosive Gases

As stated in Corrosive Gases Requirements.

□ Y □ N □ N/A

Electrostatic discharging

As stated in ESD Prevention Requirements.

□ Y □ N □ N/A

Electromagnetic shielding

As stated in Electromagnetism Requirements for the Equipment Room.

□ Y □ N □ N/A

Surge protection

As stated in Requirements for Lightning Proof Grounding.

□ Y □ N □ N/A

Power supply facility

As stated in Power Supply Requirements.

□ Y □ N □ N/A

Translation
Download
Updated: 2019-01-04

Document ID: EDOC1100059253

Views: 16433

Downloads: 26

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next