No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

HUAWEI NIP6800 Series V500 Hardware Guide

This document of the NIP6800 Series describes hardware structure, installation guide, and hardware maintenance. The content of this document includes the appearance and specifications of the product, the supported expansion cards, preparation before the installation, installation, cabling, and hardware replacement.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Post - Installation Checklists

Post - Installation Checklists

After you install the device in a cabinet and before you power on the device, verify that the cables and NE40E have been installed correctly.

Cabinet Installation Checklist

No.

Item

1

The cabinet is positioned according to instructions in the engineering design document.

2

The deviation of the cabinet is less than 3 mm horizontally and not more than 3 mm vertically.

3

All bolts are firmly fastened, especially those for electrical connections. Both flat washers and spring washers are used and the spring washers are placed over the flat washers.

4

The cabinet is neat and clean.

5

The doors can be opened and closed smoothly.

6

All labels, tags, and nameplates are correct, legible, and complete.

Installation Environment Checklist

No.

Item

1

The equipment is free of fingerprints or other smudging.

2

The cables are free of excessive electrical tape and cable ties.

3

The area around the equipment is free of tape, cable ties, packaging bags, and trash.

4

All items around the equipment are neat, clean, and intact.

Cable Installation Checklist

No.

Item

1

All the self-made ground cables are copper-based with proper wire diameters. There is no switch or fuse on the cable and no area of disconnection.

2

Ground cables, AC input power cables, and cables in the cabinet are connected correctly according to the power system wiring diagram. Screws are tightened. Output and input cables are not short-circuited.

3

Extra power and ground cable are stripped off, not coiled.

4

The lugs at both ends of each power cable or ground cable are properly crimped.

5

Bare wires and lug handles at the wiring terminals are wrapped tightly with insulation tape or heat shrink tubing.

6

The flat washer and spring washer are mounted securely to all the wiring terminals.

7

All cable connectors are securely linked, especially those at the bottom of the cabinet.

8

The cables are properly bound. Cable ties are tied at equal intervals and in the same direction

9

The power cable and ground cable are routed separately from other cables.

10

The cable layout facilitates future maintenance and expansion.

11

The labels at each end of each cable are legible.

12

Excess cable tie is trimmed off without leaving rough edges.

Translation
Download
Updated: 2019-01-04