No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FusionCloud 6.3.1.1 Solution Description 04

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
About This Document

About This Document

Overview

FusionCloud is a new-generation service-driven data center (DC) solution that features unified management of physically discrete but logically unified resources, and cloud-pipe synergy. This document describes the overview, architecture, application scenarios, and technical specifications of the FusionCloud solution, as well as the basic information about solution components and cloud services.

Intended Audience

This document is intended for:
  • Pre-sales engineers
  • Technical support engineers

Symbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol

Description

Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury.

Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results.

NOTICE is used to address practices not related to personal injury.

Calls attention to important information, best practices and tips.

NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration.

Change History

Issue

Date

Description

04

2019-09-06

This issue is the fourth official release.

Updated section“Elastic Load Balance (ELB)

03

2019-06-06

This is the third official release.

Updated Deployment Architecture.

02

2019-04-15

This is the second official release.

01

2019-01-26

This is the first official release.

Translation
Download
Updated: 2019-10-23

Document ID: EDOC1100063247

Views: 64804

Downloads: 182

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next