Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
display ap update schedule-task

display ap update schedule-task

Function

The display ap update schedule-task command displays information about scheduled AP upgrade tasks.

Format

display ap update schedule-task

Parameters

None

Views

All views

Default Level

1: Monitoring level

Usage Guidelines

You can use this command to view information about scheduled AP upgrade tasks, and run the undo ap update schedule-task { all | task-id task-id } command to delete the scheduled tasks that have been completed or are not needed.

Example

# View information about scheduled AP upgrade task.

<Huawei> display ap update schedule-task
-------------------------------------------------------------------------------------
 Task-ID  Task-State  Start-Time        Stop-Time         AP-Type  AP-Group
-------------------------------------------------------------------------------------
 1        IDLE        2016/11/01 11:11  2017/01/01 11:12  54       -
-------------------------------------------------------------------------------------
Table 18-23  Description of the display ap update schedule-task command output
Item Description
Task-ID

ID of a scheduled AP upgrade task.

Task-State
Status of the scheduled AP upgrade task.
  • DEAD: The start time of the task is earlier than the system time, or the task stops unexpectedly.
  • DONE: The task is executed.
  • IDLE: The task has not been activated.
  • OVERTIME: The task times out.
  • RUNNING: The task is running.
  • WAITING: The task is in waiting state because the start time of the task has reached but a task is running.
Start-Time

Start time of the scheduled AP upgrade task.

Stop-Time

End time of the scheduled AP upgrade task.

AP-Type

Type of the APs to be upgraded.

AP-Group

AP group to which the APs to be upgraded belong.

Translation
Download
Updated: 2019-11-21

Document ID: EDOC1100064352

Views: 207960

Downloads: 122

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next