S600-E V200R013C00 Configuration Guide - Device Management

This document describes the configurations of Device Management, including device status query, hardware management, Stack, SVF, cloud-based management, PoE, OPS, energy-saving management, information center, fault management, NTP.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Establishing a Stack Using Dedicated Stack Cables

Establishing a Stack Using Dedicated Stack Cables

Installation Preparation

  • Components: dedicated stack cables
  • Tools: ESD wrist strap or ESD gloves

Precautions

  • Wear an ESD wrist strap or ESD gloves during the installation.
  • Ensure that the stack cables are not tangled with other cables.
  • To remove a cable, gently push the connector of the cable and then pull out the cable by the pull ring.

Cable Connections

  • Logical stack port 1 on one switch must be connected to logical stack port 2 on another switch. Logical stack port numbers have been preconfigured for physical ports. The first two uplink optical ports are logical stack ports 1, and the last two uplink optical ports are logical stack ports 2. To view the port numbers, run the display stack port auto-cable-info command.
  • Stack member ports of a logical stack port can be connected at any sequence. Each logical stack port can have one or more physical ports connected.
  • If logical stack port numbers have been configured manually, these port numbers will not change after stack cables are connected. The preconfigured logical stack port numbers do not take effect. Connect stack cables according to the configured port numbers.
  • In unconfigured deployment scenarios, you are advised to connect member switches based on the following rules:
    • Connect the switches in sequence from top to bottom, as shown in Figure 3-32.
    • Ensure that all logical stack ports of the top switch are connected to the master ends of cables, all logical stack ports of the bottom switch are connected to the slave ends of cables, and two logical stack ports of the intermediate switch are connected to the master and slave ends respectively.
    • After the switches have been connected using dedicated stack cables, they automatically set up a stack and their stack IDs as well as stack roles are automatically assigned.
    • If the switches are not connected in a ring topology, you only need to ensure that logical stack port 1 of the local switch is connected to logical stack port 2 of the remote switch. In this situation, these switches can set up a stack, but their master and standby roles and stack IDs are randomly generated.
  • To perform stack capacity expansion on a switch that already has the configuration, pay attention to the following:
    • Ports with dedicated stack cables installed cannot have any service configuration.
    • You only need to ensure that logical stack port 1 of one switch is connected to logical stack port 2 of another switch, without having to consider the master/slave ends of dedicated stack cables.
    • The existing stack ID of the switch is used when no stack ID conflict occurs. If such a conflict occurs, a new stack ID is automatically assigned to the switch.

Installation Procedure

Stack member switches can set up a stack in a chain or ring topology through service port connections. Figure 3-32 and Figure 3-33 show stack cable connections in a stack that is set up by three S628X-E switches in ring and chain topologies respectively. On these member switches, the first two 10GE optical ports are preconfigured as stack member ports of logical stack port 1, and the last two 10GE optical ports are preconfigured as stack member ports of logical stack port 2. Here, each logical stack port has two stack member ports connected and can also have one stack member port connected. To ensure reliability, it is recommended that a logical stack port have two or more stack member ports connected.

NOTE:
  • Before using dedicated stack cables to connect member switches, you are advised to power off all member switches to ensure safety.
  • The two ends of a dedicated stack cable are the master end with the Master tag and the standby end without any tag.
  • When the switch is running and a dedicated stack cable is removed and inserted to a port, this port changes between a service port and a stack port after 60 seconds to prevent flapping in the event that this cable is removed and inserted to this port multiple times in a short time. That is, this port becomes a stack port 60 seconds after a dedicated stack cable is inserted to it or it becomes a service port 60 seconds after this cable is removed from it. If the stack configuration has been saved before the dedicated stack cable is removed from a stack port, this stack port will not automatically become a service port.
  • If ports cannot automatically become stack ports after they have dedicated stack cables connected, an alarm 1.3.6.1.4.1.2011.5.25.183.1.22.64 hwStackAutoConfigFailed is generated. Solve this problem based on the possible causes and procedure described in this alarm.
Figure 3-32  Stack set up in a ring topology using dedicated stack cables

Figure 3-33  Stack set up in a chain topology using dedicated stack cables
  • If the switches have been powered off before they have stack cables connected, you are advised to power on them in sequence. If you want a specific switch to become the master switch, power on it first. After it starts, power on other switches. In the following example, three switches, SwitchA, SwitchB, and SwitchC set up a stack in a chain topology, and SwitchA becomes the master switch after the three switches are powered on in the following sequence:
    1. Power on and start SwitchA and then power on SwitchB.
    2. Check whether SwitchA and SwitchB set up a stack successfully according to Checking Whether a Stack Has Been Established Through Service Port Connections.
    3. Power on SwitchC.
    4. Check whether SwitchA, SwitchB, and SwitchC set up a stack successfully according to Checking Whether a Stack Has Been Established Through Service Port Connections.
  • If the switches are not powered off before they have stack cables connected, their roles and stack IDs will be randomly assigned.
Translation
Download
Updated: 2019-04-20

Document ID: EDOC1100066159

Views: 25400

Downloads: 3

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next