No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

S600-E V200R013C00 Configuration Guide - Device Management

This document describes the configurations of Device Management, including device status query, hardware management, Stack, SVF, cloud-based management, PoE, OPS, energy-saving management, information center, fault management, NTP.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
(Optional) Configuring the Device to Allow High Inrush Current During Power-On

(Optional) Configuring the Device to Allow High Inrush Current During Power-On

Context

High inrush current may be generated when a non-standard PD is powered on. In this case, the device cuts off the power of the PD to protect itself. If the device is required to provide power for the non-standard PD, it must allow high inrush current.
Allowing high inrush current may disable self-protection of the device and damage components of the device.

Procedure

  1. Run system-view

    The system view is displayed.

  2. Run poe high-inrush enable [ slot slot-id ]

    The device is configured to allow high inrush current during power-on.

    By default, the device does not allow high inrush power during power-on.

Translation
Download
Updated: 2019-04-20

Document ID: EDOC1100066159

Views: 25310

Downloads: 3

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next