No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

S600-E V200R013C00 Configuration Guide - Device Management

This document describes the configurations of Device Management, including device status query, hardware management, Stack, SVF, cloud-based management, PoE, OPS, energy-saving management, information center, fault management, NTP.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Splitting a Stack

Splitting a Stack

Context

If a stack is no longer used, you can split the stack into standalone switches. A split process includes the following steps.
  1. Back up the stack configuration file.

  2. Remove stack cables.

  3. Restore the default stack configuration.

  4. Power off all the member switches.

Procedure

  • Splitting a stack established through service port connections (using ordinary and dedicated cables)
    1. Run the save command to save the configuration.
    2. Run the copy source-filename destination-filename all command to back up the configuration file to all the member switches, so that you can use the configuration file when you set up a stack the next time.
    3. Remove the stack cables between the member switches. After you remove the stack cables, the stack splits and some member switches restart. The remote login may fail because some configurations of member switches such as the IP address are the same. Log in to a switch through the console port to perform configurations.
    4. Run the system-view command to enter the system view.
    5. Run the reset stack configuration command to clear the stack configuration.

      The cleared stack configuration includes: switch slot ID, stack priority, stack reserved VLAN, stack MAC address switching delay, stack port configuration, and stack port rate configuration. Running this command will restart the switch.

    6. Power off all the member switches.
Translation
Download
Updated: 2019-04-20

Document ID: EDOC1100066159

Views: 25877

Downloads: 3

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next