No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

S600-E V200R013C00 Configuration Guide - Device Management

This document describes the configurations of Device Management, including device status query, hardware management, Stack, SVF, cloud-based management, PoE, OPS, energy-saving management, information center, fault management, NTP.
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
How Do I Specify a Switch in a Stack as the Master Switch?

How Do I Specify a Switch in a Stack as the Master Switch?

To manually specify a member switch as the master, power on that switch first, and then wait 20 seconds before powering on the other switches.

The master election timeout period is 20 seconds. The length of time each member switch spends in startup may differ significantly. Therefore, when the stack is powered on or restarts, not all member switches participate in the master election. Member switches that start more than 20 seconds later than the first switch to complete startup cannot be elected the master switch.

Translation
Download
Updated: 2019-04-20

Document ID: EDOC1100066159

Views: 26421

Downloads: 3

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next