No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

OceanStor 9000 V5 7.0 Command Reference 03

Rate and give feedback :
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
change remote_replication switch

change remote_replication switch

Function

The change remote_replication switch command is used to switchover a remote replication pair.

Format

change remote_replication switch <id>

Parameters

Parameter

Description

Value

id Pair ID

The value is a combination of numbers, and is 1 to 128 characters in length.

Level

Resource administrator

Usage Guidelines

None

Example

Switchover a remote replication pair.

admin:/>change remote_replication switch 10382957377019552493
DANGER: You are about to perform a primary/secondary switchover for the remote replication.
This operation exchanges roles of primary and secondary directories.
Before performing this operation, ensure that you have selected the correct remote replication and a primary/secondary switchover is necessary.
Have you read danger alert message carefully?(y/n)y
 
Are you sure you want to perform the operation?(y/n)y
Command executed successfully.

System Response

None

Translation
Download
Updated: 2019-05-07

Document ID: EDOC1100067955

Views: 24666

Downloads: 7

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next