No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

OceanStor 9000 V5 7.0 Parts Replacement 05

Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Replacing a Power Module

Replacing a Power Module

Power modules support 1+1 redundancy and are hot-swappable.

Impact on the System

None

Prerequisites

  • The replacement power module is ready.
  • The faulty power module has been located.

Precaution

Before replacing a power module, disconnect it from the external power source. Otherwise, device damage or even personal injury may occur.
  • Use care when you remove and insert a disk module to avoid any damage to the appearance or connectors of the power module.
  • Remove the faulty power module and insert the replacement one within 2 minutes.
  • When installing a power module, do not place fingers over the power module. Otherwise, your fingers may be hurt.

Procedure

  1. Wear an electrostatic discharge (ESD) wrist strap or ESD gloves.
  2. Optional: If you are going to configure only one power module, power off the storage node.
  3. Open the velcro strap binding the power cables.
  4. Remove the power cable from the PSU to be replaced. See Figure 2-11.

    Figure 2-11  Removing a power cable

  5. Press the latch on the PSU in the arrow direction, and pull the PSU out of the slot by holding the handle. See steps (1) and (2) in Figure 2-12.

    Figure 2-12  Removing a PSU

  6. Place the removed PSU in an ESD bag.
  7. Take the spare AC PSU out of its ESD bag.
  8. Push the spare AC PSU along the guide rails into a slot until the PSU clicks into place.

    The PSU latch snaps in so that the PSU does not move. See Figure 2-13.

    Figure 2-13  Installing an AC PSU

  9. Connect the power cable to the PSU. See Figure 2-14.

    Figure 2-14  Connecting a power cable to an AC PSU

  10. Use a velcro strap to bundle the power cables onto the eject lever of the power module.
  11. View the power module indicators to check whether the installation is successful.

    • If the power module indicators are steady green, the installation is successful.
    • If the power module indicators are off, the power module is improperly installed. In this case, remove and reinsert the power module.

  12. Inspect the system using SmartKit. Choose Home > Storage > Routine Maintenance > More > Inspection to check the system status. For details, see the OceanStor 9000 V5 Routine Maintenance.

    • If all inspection items are successful: The inspection is successful.
    • If some inspection items fail the inspection: The inspection is failed. Rectify the faults by taking recommended actions in the inspection reports. You need to reperform inspection after rectifying. If the inspection is still failed, contact Huawei technical support.

Follow-up Procedure

After replacing the power module, label the replaced power module to facilitate subsequent operations.

Download
Updated: 2019-07-25

Document ID: EDOC1100067965

Views: 13453

Downloads: 15

Average rating:
This Document Applies to these Products
Related Version
Related Documents
Share
Previous Next